X

Phase 1: Team Foundation, System Redesign, and Strategic Outreach

This phase focused on training new members, redesigning our autonomous systems for the updated competition rules, and publicly showcasing our maritime and aerial technologies to forge strategic alliances with key naval and aerospace stakeholders.

2025

Phase 2: Design Validation

This phase centered on dry-land testing and system integration for the USV, UAV, and UUV. The team validated hardware assemblies, established cross-platform network connectivity, and successfully tested teleoperation, sensor pipelines, and ROS 2 communication prior to in-water deployment.

2026

Phase 3: Getting Into Water

This phase transitioned testing to in-water environments. The team validated buoyancy, watertight seals, and power distribution for both the USV and UUV. Key milestones included successful teleoperation via RC and ROS 2, recording sensor datasets (ROSbags), and deploying the full software stack for initial autonomous navigation tests.

2026

Phase 4: Proof of Readiness and Autonomous Tasks

This phase culminated in the execution of autonomous navigation and the completion of the competition's Proof of Readiness (PoR) requirements. The team successfully validated Nav2 autonomy, tested critical safety systems like the Kill Switch, and significantly reduced vehicle setup times, while also diagnosing ASV navigation deviations and gathering critical UUV vision datasets for AprilTag detection.

2026
Desplazamiento al inicio